top of page
Lincoln Center
Address:

Lincoln Center, 70 Lincoln Center Plaza, New York, NY

Building Type:

Institutional

Location:

Substrate:

Concrete

Method:

Owner:

Lincoln Center for the Performing Arts Mgmt.

Property Manager: 

Client:

General Contractor:

Structural Contracting Services, Inc.

Technical Consultant: 

O&S Associates

The existing tunnel on Manhattan’s west side that runs under 65th Street links the sub cellar mechanical rooms of the Julliard Building Complex and The Lincoln Center Performing Arts Theater. As the old coatings surrounding the exterior tunnel began to deteriorate, the tunnel experienced water infiltration for many years resulting in heavy degradation of the concrete walls, horizontal structural ceiling slab and the floor slab. As a result of the heavy deterioration, the project involved remediating the water intrusion within these concrete structures so that a concrete repair program could be instituted. CGI performed a comprehensive injection-waterproofing program within approximately 2000 SF of these concrete structures whereupon Structural Contracting Services, Inc. performed the structural concrete repair and steel reinforcement work. After (x amount of time), the tunnel was restored to its original condition with the added protection and longevity provided by CGI waterproofing membrane.

See the process in action

This case study gallery showcases the step-by-step waterproofing process we perform for clients — from active water intrusion to fully sealed structures. Each example includes progress photos that illustrate our negative-side injection method in action, so you can see the results for yourself.

bottom of page